The Savin Group Savin Engineers, P.C. JMOA Engineering, P.C.
Improving Quality of Life News & Announcements Portfolio Client List Contact Us        
About Us
Environmental
Transportation
Structural
Field Services
Educational
Facilities Management
MEP
Career Opportunities
Contact Us
Site Map
Home

 

 

 

 

 

 

 

 

 

 

 
      
       Yonkers CSO Phase IV-V
 
 
  Department of Environmental Facilities Westchester County, New York
 
  Yonkers, NY
 
  $11,000,000
   
 




Savin Engineers performed all structural design, shop drawing review and construction management services for one of the largest swirl concentrator facilities on the East Coast. The project included the construction of two 22-foot diameter swirl concentrators and a chlorine contact tank.

Because the swirl concentrators and CSO treatment facilities are located within an existing headworks building at the Yonkers Joint Wastewater Treatment Plant, a critical element of the project was to maintain plant flows and integrity of existing structures during construction. Savin provided an extremely detailed demolition and construction-phasing plan in order to accomplish this.

All reinforced concrete design was performed in accordance with American Concrete Institute Codes, ACI 318 – Building Code Requirements for Structural Concrete and ACI 350 – Concrete Sanitary Engineering Structures.